Checklist: Venting Clearance and Code Rules for Battery Cabinets
According to NFPA 855, individual energy storage system units should generally be separated by at least three feet, unless the manufacturer has conducted large-scale fire testing (part
Spaces about battery systems shall comply with 110.26. Working space shall be measured from the edge of the battery cabinet, racks, or trays. For battery racks, there shall be a minimum clearance of 25 mm (1 in.) between a cell container and any wall or structure on the side not requiring access for maintenance.
The battery cabinet must be installed adjacent to the power cabinet. The following diagram shows the equipment layout for a typical new indoor Macrocell site. Notes: The cabinets may be placed with zero clearance to the rear wall. The cabinets may be placed with zero clearance to the side wall, however some clearance is recommended.
For battery racks, there shall be a minimum clearance of 25 mm (1 in.) between a cell container and any wall or structure on the side not requiring access for maintenance. Battery stands shall be permitted to contact adjacent walls or structures, provided that the battery shelf has a free air space for not less than 90 percent of its length.
Battery locations shall conform to 480.9 (A), (B), and (C). (A) Ventilation. Provisions appropriate to the battery technology shall be made for sufficient diffusion and ventilation of gases from the battery, if present, to prevent the accumulation of an explosive mixture. (B) Live Parts. Guarding of live parts shall comply with 110.27.
.PDF includes complete article with source references.
Download UPS datasheets, battery sizing guides, and power redundancy white papers.
Via Monte Rosa, 91
20149 Milan, Italy
Italy (Sales): +39 06 8745 3292
Italy (Support): +39 335 729 8537
Mon-Fri: 9:00 AM – 6:00 PM (CET)