Energy Storage Systems User Manual
All kinds of equipment of the energy storage cabinet have been installed before leaving the factory, and the energy storage cabinet can be lifted and transported during transportation.
Manual for the following additional information: Battery system installation instructions, start-up processes, sub-assembly removal and replacement procedures, wiring, and safety information. Detailed illustrations of the cabinet, connection point drawings and detailed schematics.
Only authorized an Eaton Customer Service Engineer or qualified service personnel authorized by Eaton may install the battery system. Detailed battery system installation instructions are found in the Eaton xStorage 400 Service Manual.
DO NOT DISCONNECT the batteries while the xStorage 400 is in service/online. Keep the cabinet doors closed and front panels installed to ensure proper cooling airflow and to protect personnel from dangerous voltages inside the unit. Do not install or operate the system close to gas or electric heat sources.
The battery system is composed of 36 battery modules installed in four battery racks. The batteries are monitored and controlled by the Samsung Battery Management System (BMS). The battery system and select portions of the inverter system are normally cooled by roof-mounted HVAC units.
.PDF includes complete article with source references.
Download UPS datasheets, battery sizing guides, and power redundancy white papers.
Via Monte Rosa, 91
20149 Milan, Italy
Italy (Sales): +39 06 8745 3292
Italy (Support): +39 335 729 8537
Mon-Fri: 9:00 AM – 6:00 PM (CET)